Hard Working Man
Done for the Member Challenge – Masculine Layout found
here: https://oscraps.com/community/threads/masculine-layout.37053/
Journaling reads: May
2022 Mark began working on a cabin for the fire pit area so there would be some
shelter for those who would get chilled in the cooler months of the year. By the time we had our family gathering at
the end of May he was starting on the floor.
In June he finished covering the floor.
In July he started raising the walls.
We got sick at the end of July and it took about a month before he felt
strong enough to work on the cabin again.
So it was September before he began the roof. The first plan was to make a roof that sloped
from the front to the back. But then he
decided to make a peaked roof, so he tore down the temporary sloped roof and
began the peaked roof in October. At the
end of October we got the tin for the roof.
And in November Mark installed the tin.
Next he began putting wood on the walls and by the end of December he
had milled and installed enough wood to cover the entire cabin on the
outside. Next came a door for the front,
glass and plastic in the windows and the other doorways. He has been working on the windows more and
put another layer of flooring down.
Eventually he needs to cover the area where the roof rafters sit on the
cabin so any heat used stays inside the cabin.
How he managed to do all of the work himself I’ll never know!